Your new gas turbine will run for decades, and the service agreement you sign at purchase shapes what it costs to keep running. Inspections, parts, repairs, response times and performance terms all sit in that contract, and a weak one can lock you into high costs or slow support for years.

Sign without a clear scope and the risks are real: surprise bills for work you thought was covered, slow response when a unit trips, parts that take months to arrive, performance terms that are hard to enforce and no way out if service is poor. That means lost output, budget overruns and a plant that never meets its promise.

USP&E Helps You Sign a Service Agreement You Understand

We know you need a service agreement that keeps your turbine running at a cost you can plan for. USP&E has delivered 150+ power projects in 45+ countries, with 25,000 MW contracted since 2002, and our engineers and project managers supply, commission and maintain gas turbines as an independent supplier and servicer. Our systems are ISO 9001 and ISO 45001 certified. USP&E is a full-service EPC and O&M contractor, not a broker.

You do not need to accept the first draft. You need a clear list of what is covered and what is not, firm response times, parts terms, performance measures you can check and the right to change course if service falls short.

Decide What the Agreement Must Cover

Start by listing the work your turbine will need over its life: routine maintenance, combustion inspections, hot gas path inspections, major overhauls, controls updates, remote monitoring and unplanned repairs. Decide which of these you want inside the agreement and which you will handle yourself or buy as needed.

Agreements range from simple parts supply to full coverage of planned and unplanned work. Full coverage gives cost certainty but costs more and may limit your choices. Lighter agreements cost less but leave more risk with you. Understanding what a long-term service agreement covers helps you choose the right level.

Check how payments are set. Some agreements charge by fired hours or starts, others by a fixed fee. Match the payment basis to how you will run the unit. A peaking unit with many starts and few hours suits a different structure from a baseload unit that runs all year.

Set Response, Parts and Performance Terms

Write firm response times into the agreement: how fast the provider must answer a call, reach site and start work after an unplanned trip. Check where their engineers and spare parts are held and whether those times are realistic for your location.

Agree parts terms. List the parts held in stock for your unit, lead times for major components and whether exchange parts are available to shorten outages. Check whether refurbished parts may be used and how their quality is proven. Read the exclusions carefully, because damage from fuel quality, foreign objects or operator error is often excluded.

Set performance measures you can check, such as availability, reliability and output and heat rate after inspections, with clear ways to measure them. Agree what happens if targets are missed. These terms also feed into how turbine project budgets are built, so your business case reflects real running costs.

Protect Your Choices for the Long Term

Check the length of the agreement and your exit rights. Can you leave if service is poor, and at what cost? Can you change scope as your plant changes? Long agreements without fair exit terms can keep you tied to a provider long after the relationship has stopped working.

Make sure you own your operating data and can share it with other providers. Ask for clear reports after every inspection. Keep the option of independent turbine O&M open, so you have choices when the agreement comes up for renewal. Our sister site covers new gas turbine generator scoping for earlier project stages.

The same thinking applies across fleets of gas turbine generators, used/new gas turbines, a remanufactured GE Frame 6B and natural gas engines/stations. Teams doing hyperscale EPC/O&M work set service terms for AI gas turbines, hyperscale generators and gas turbines for compute, including the New USP&E FX-45 45MW Modular Gas Turbine for the Hyperscale Data Center sector in the USA.

Local Teams Near Your GT Commissioning Site

Data-centre schedules are won or lost in permitting, gas supply and interconnection, so USP&E puts its US offices first. Colorado Springs (1755 Telstar Dr, Suite 300) and Knoxville (800 S Gay St, Suite 700) give you two US bases for engineering reviews, procurement follow-up and site visits, and both teams work your new GT commissioning programme alongside you rather than from a sales desk.

Behind them, London (162-168 Regent Street) handles structuring, bonding and finance; Johannesburg (22 Kildoon Rd, Bryanston) owns engineering and project controls for new gas turbines, commissioning spares and bridge units; Cape Town (31 Brickfield Road, Woodstock) supports design and commissioning; and Wuxi, China (No. 1, Ningzhou Road, Wuxi) manages China manufacturing and supply-chain follow-up.

For service agreements, Colorado Springs and Knoxville engineers review scope, response and parts terms for US turbines, while Johannesburg and Cape Town support units across Africa. Regions served: USA | AFRICA | UK | UAE | CHINA. That network stands behind 150+ power projects in 45+ countries and 25,000 MW contracted since 2002, run under ISO 9001 and ISO 45001 certified systems.

USP&E Track Record for GT Commissioning

You want proof that USP&E can supply and service gas turbines. These projects show that record.

  • USP&E has refurbished seven GE Frame 6B gas turbines to zero hours in-house for major US hyperscale data-centre developers.
  • A gold mine in Mauritania: USP&E supplied and installed a Caterpillar backup power station of low-hour Cat 3516B gensets with new switchgear, on time and on budget. Read the case study.
  • A gold mine in Mali: USP&E rebuilt more than 80 MW of Caterpillar CM32 engines and added 24 MW of new zero-hour capacity, delivering a 104 MW station with 300% greater reliability and availability than previously recorded at site. Read the case study.

HowTo: Scope a Service Agreement for a New GT

Your 3-step plan: 1. Share your turbine details, running plan and draft agreement. 2. Receive a scope review with gaps and risks marked. 3. Agree terms and run your unit with confidence.

  1. List the maintenance events the turbine will need over the agreement term.
  2. Decide which events, parts and labour the agreement should cover.
  3. Set availability and response terms you can measure.
  4. Agree reporting, data access and review meetings.
  5. Read exclusions, start and exit terms and ask about anything unclear.
  6. Compare offers on scope and risk, not just headline cost.

Resources and live pathway

Data centres · EPC · O&M · About USP&E · Contact.

FAQ: New GT Service Agreement Scope

What should a gas turbine service agreement cover?

USP&E reviews service agreements against the work your turbine will need: routine maintenance, combustion and hot gas path inspections, major overhauls, controls updates, monitoring and unplanned repairs. You then decide which items belong inside the agreement and which you will buy separately as needed.

How are gas turbine service agreements usually priced?

USP&E sees agreements priced by fired hours, by starts or by a fixed fee. The right basis depends on how you run the unit, because a peaking unit with many starts and few hours suits a different structure from a baseload unit running all year.

What response times should a service agreement include?

USP&E recommends firm times for answering calls, reaching site and starting work after an unplanned trip. Check where the provider’s engineers and spare parts are held, so the promised times are realistic for your location and not just words in the contract.

What exclusions are common in turbine service agreements?

USP&E advises reading exclusions carefully, because damage from fuel quality, foreign objects or operator error is often excluded. Knowing these limits helps you manage fuel, filtration and training properly and avoid surprise bills for work you thought the agreement covered.

Where are USP&E’s offices for gas turbine service?

USP&E supports gas turbine service from Colorado Springs and Knoxville for US units, with engineers who review scope and parts terms. Johannesburg and Cape Town support units across Africa, London covers contracts and finance, and Wuxi supports equipment and parts made in China.

Has USP&E delivered gas turbine projects before?

USP&E has refurbished seven GE Frame 6B gas turbines to zero hours in-house for major US hyperscale data-centre developers. Public case studies include NEOM in Saudi Arabia, where USP&E supplied zero-hour Siemens SGT-400 gas turbines as the single technical and commercial interface.

Is USP&E a broker for gas turbine service?

USP&E is not a broker. USP&E is an independent supplier and servicer that maintains gas turbines with its own engineers, so the team that reviews your agreement is the same team that understands the work and can deliver it if you choose.

How fast can USP&E review a service agreement?

USP&E can start reviewing your turbine details, running plan and draft agreement as soon as you share them. Engineers mark scope gaps, weak response terms and risky exclusions first, so you can negotiate changes before you sign a long-term contract.

Service Terms That Work for You

Scope your service agreement clearly and your turbine runs for years at costs you can plan for. Sign a vague one and every surprise lands on your budget. USP&E will help you review, agree and run with confidence.

Request a fast quote for your new GT commissioning programme on the USP&E contact page, call +27 10 822 2324 or email info@uspeglobal.com. Want to see what is available today? Search the USP&E inventory.

Powering Possibility. Built for the Frontier.


Where we operate

USA | AFRICA | UK | UAE | CHINA

USP&E United States

Colorado Springs Office: 1755 Telstar Dr, Suite 300

Knoxville Office: 800 S Gay St, Suite 700

USP&E South Africa

Johannesburg Office: 22 Kildoon Rd, Bryanston

Cape Town Office: 31 Brickfield Road, Woodstock

USP&E United Kingdom

London Office: 162-168 Regent Street

USP&E China

China Office: No. 1, Ningzhou Road, Wuxi

Call:+27 10 822 2324  |  E:info@uspeglobal.com

ISO Certifications
ISO9001ISO45001

Powering Possibility. Built for the Frontier.
Full-service EPC & O&M. Not a broker.

© 2026 USP&E · New Gas Turbines is part of USP&E