• Home
  • About USP&E: New and Used Gas Turbine Specialists
  • Gas Turbine Updates
  • Gas Turbines for Sale With EPC Support | USP&E
  • Gas Turbine Operations and Maintenance | USP&E
  • Power Station EPC for Gas Turbine Plants | USP&E
  • Power Plant Design and Engineering | USP&E
  • Contact Us | New Gas Turbines
  • Gas Turbine Updates
  • New Gas Turbines | Used GTs & Modular Gas Turbine | USP&E
  • Modular Gas Turbine New Gas Turbines | USP&E
  • Gas Turbine EPC and O&M | USP&E
  • Gas Turbine and EPC Videos | USP&E
  • Gas Turbine and EPC Brochures | USP&E
  • New Gas Turbines for Sale — Inventory & EPC | USP&E
  • Used Gas Turbines and Surplus Power Stations | USP&E
  • Gas Turbine Power Stations | USP&E
  • Modular Gas Turbine Slots for Later Phases | USP&E
  • Power Station EPC with Inventory Turbines | USP&E
  • SEARCH INVENTORY Buying Workflow for New and Used Gas…
  • Surplus Frame and Aeroderivative Gas Turbines | USP&E
  • Used Gas Turbine Inspection Checklist | USP&E
  • EPC and O&M for New and Used Gas Turbines | USP&E
  • Modular Gas Turbines and the Pathway — Allowed…
  • New Gas Turbines Buying Guide — Inventory First, Then…
  • New vs Used Gas Turbines — A Qualitative Comparison for…
  • Used Gas Turbines — Inventory Hub, Inspection Path, and…
  • Buying Used and New Gas Turbines | USP&E
  • Gas Turbine Generators Inventory Path | USP&E
  • Natural Gas Engine Power Stations | USP&E
  • Power Station EPC and O&M for Hyperscale Campuses | USP&E
  • Remanufactured GE Frame 6B Power Stations | USP&E
  • New Gas Turbines for Hyperscale | USP&E
  • New Gas Turbines with a Frame 6B Bridge into Modular Gas Turbine Growth
  • Articles
  • About Us
  • New GT Commissioning Gates | USP&E
  • New GT Grid-Code Compliance | USP&E
  • New GT Foundation Dynamic Loads | USP&E
  • New GT Relay Coordination Study | USP&E
  • New GT Fire and Gas Detection | USP&E
  • New GT Inlet Air Filtration | USP&E
  • New GT Lube-Oil Cooler Scope | USP&E
  • New GT Step-Up Transformer Scope | USP&E
  • New GT Warranty and Handover Scope | USP&E
  • New GT Factory Acceptance Testing | USP&E
  • New GT Site Storage Preservation Scope | USP&E
Skip to content
New/Used Gas Turbines Available
  • Home
  • About USP&E: New and Used Gas Turbine Specialists
  • Gas Turbine Updates
  • Gas Turbines for Sale With EPC Support | USP&E
  • Gas Turbine Operations and Maintenance | USP&E
  • Power Station EPC for Gas Turbine Plants | USP&E
  • Power Plant Design and Engineering | USP&E
  • Contact Us | New Gas Turbines
  • Gas Turbine Updates
  • New Gas Turbines | Used GTs & Modular Gas Turbine | USP&E
  • Modular Gas Turbine New Gas Turbines | USP&E
  • Gas Turbine EPC and O&M | USP&E
  • Gas Turbine and EPC Videos | USP&E
  • Gas Turbine and EPC Brochures | USP&E
  • New Gas Turbines for Sale — Inventory & EPC | USP&E
  • Used Gas Turbines and Surplus Power Stations | USP&E
  • Gas Turbine Power Stations | USP&E
  • Modular Gas Turbine Slots for Later Phases | USP&E
  • Power Station EPC with Inventory Turbines | USP&E
  • SEARCH INVENTORY Buying Workflow for New and Used Gas…
  • Surplus Frame and Aeroderivative Gas Turbines | USP&E
  • Used Gas Turbine Inspection Checklist | USP&E
  • EPC and O&M for New and Used Gas Turbines | USP&E
  • Modular Gas Turbines and the Pathway — Allowed…
  • New Gas Turbines Buying Guide — Inventory First, Then…
  • New vs Used Gas Turbines — A Qualitative Comparison for…
  • Used Gas Turbines — Inventory Hub, Inspection Path, and…
  • Buying Used and New Gas Turbines | USP&E
  • Gas Turbine Generators Inventory Path | USP&E
  • Natural Gas Engine Power Stations | USP&E
  • Power Station EPC and O&M for Hyperscale Campuses | USP&E
  • Remanufactured GE Frame 6B Power Stations | USP&E
  • New Gas Turbines for Hyperscale | USP&E
  • New Gas Turbines with a Frame 6B Bridge into Modular Gas Turbine Growth
  • Articles
  • About Us
  • New GT Commissioning Gates | USP&E
  • New GT Grid-Code Compliance | USP&E
  • New GT Foundation Dynamic Loads | USP&E
  • New GT Relay Coordination Study | USP&E
  • New GT Fire and Gas Detection | USP&E
  • New GT Inlet Air Filtration | USP&E
  • New GT Lube-Oil Cooler Scope | USP&E
  • New GT Step-Up Transformer Scope | USP&E
  • New GT Warranty and Handover Scope | USP&E
  • New GT Factory Acceptance Testing | USP&E
  • New GT Site Storage Preservation Scope | USP&E

Gas Turbine Updates

Gas Turbine Fuel Flexibility: A Buyer’s Guide | USP&E

by adminArticlesPosted on November 13, 2026November 13, 2026Comments are Disabled

Which fuels new gas turbines can burn and what buyers should ask: pipeline gas, LNG, liquid fuel backup, LPG, process gases, switching and emissions.

Gas Turbine Starting Systems Explained | USP&E

by adminArticlesPosted on November 12, 2026November 13, 2026Comments are Disabled

How gas turbines are started: electric motors, static frequency converters, hydraulic and air starters, diesel cranking, purge, ignition and reliability.

Gas Turbine Trips: Common Causes and Fixes | USP&E

by adminArticlesPosted on November 11, 2026November 13, 2026Comments are Disabled

Why gas turbines trip: flame-out, vibration, exhaust spread, lube oil, fuel gas, overspeed, instrument faults and grid events, and how plants reduce trips.

Hydrogen-Capable Gas Turbines: Questions to Ask | USP&E

by adminArticlesPosted on November 10, 2026November 13, 2026Comments are Disabled

What hydrogen-capable means for a new gas turbine: blend limits, combustion, NOx, fuel system, safety, upgrades and the questions buyers should ask.

Gas Turbine Controls Upgrade and Obsolescence | USP&E

by adminArticlesPosted on November 9, 2026November 13, 2026Comments are Disabled

Why and how to upgrade legacy gas turbine controls: obsolescence risk, scope options, I/O, protection, migration steps, testing and commissioning.

Gas Turbine Inspection Intervals Explained | USP&E

by adminArticlesPosted on November 6, 2026November 13, 2026Comments are Disabled

Gas turbine inspection intervals explained: combustion, hot gas path and major inspections, starts against hours, planning outages and spares.

Gas Turbine NOx Control: DLN, Water and Catalysts

by adminArticlesPosted on November 5, 2026November 13, 2026Comments are Disabled

How new gas turbines control NOx: why it forms, dry low NOx combustors, water and steam injection, selective catalytic reduction and monitoring.

Comparing Gas Turbines on Lifecycle Value | USP&E

by adminArticlesPosted on November 3, 2026November 13, 2026Comments are Disabled

How buyers should compare gas turbines for long-term value: fuel, efficiency, maintenance intervals, availability, degradation, support and residual value.

What Is an Aeroderivative Gas Turbine? | USP&E

by adminArticlesPosted on November 2, 2026November 13, 2026Comments are Disabled

What is an aeroderivative gas turbine? How a jet engine core becomes a power plant, what changes, where aeroderivatives work best and how they are run.

New Gas Turbine Delivery Options for Data Centers | USP&E

by adminArticlesPosted on November 2, 2026November 13, 2026Comments are Disabled

New gas turbines are in short supply. Compare new, modular, surplus and refurbished routes to data center power, and combine them into a phased power plan.

Posts pagination

1 2 … 5
USP&E
Johannesburg Executive HQ: Jindal Office Building, 22 Kildoon Rd, Bryanston, Sandton, 2191 GP RSA
Tel: via USP&E contact
Email: info@uspeglobal.com
/// Contact info
Tel:USP&E
Email: info@uspeglobal.com
Copyright © 2026 New/Used Gas Turbines Available Inspiro Theme by WPZOOM
Scroll to top